Week 1
1/04/2023
- Modified signal file so that there are no decimals in the quality
- Modify picocuries so that they are 10^12 and not 10^9 in the INP files.
- Create an excel sheet to change curies to picocuries for each plume.
- Created extra config so banklick and Example6_Final will no longer use the same config files.
- Worked with sudhir to come up with slide deck for Meeting.
- Attended meeting with Sudhir and Jake for Chama.
1/05/2023
- Wrote up tickets based on Meeting Minutes
- Went over Meeting Min with Deven and Sudhir
- Ticket Chama22 #10 Refactor method name step_swmm to iterate_swmm
- Discussed Optimization approach with Sudhir in the context of ticket Chama22 #11
- Katherine's code does not run on normal PySWMM.
- Wrote Ann an email about PySWMM
- Verified that Optimize is being used in Chama.
- Discussed database with Deven and Sudhir.
1/6/2023
- Got Ticker Chama22 #9 Add the simulation time corresponding to each step index to the signals CSV
- Wrote up the issues with Chama and using Unix timestep for Sudhir.
- Started Cleaning up code this is still on going.
- Got ready for meeting with SD1 and EPA Chama group.
- Attended meeting for SD1 and Chama Group.
- Wrote Up meeting Minutes.
- Looked into the Banklick Watershead council.
- Updated Tickets for Chama.
Notes
For the Meeting Tomorrow:
You can see in the images below that the Cesium value for both plumes is 0.
Plume 1

Plume 2

To Do
- Discuss database with Jake and Sudhir.
- Add Meeting notes to Read Me project.
- Work on chama22 tickets assigned (Start with 9)
9
12
13
14
15
- Get Chama a little more organized.