Week 1
3/6/2023 Monday
- Greenscope
- Indicators
- Fixed the check all JS.
- Added in Js so that the Symbols work now.
3/7/2023 Tuesday
- Greenscope
- Best worst
- Fixed The Manual Entry needed to not make input box too small.
3/8/2023 Wednesday
- Greenscope
- Results
- Numerical section works.
- Graphical section does not work for either project.
- Started to look into where the JS for graphical is but switched to Project summary.
- Project Summary
- Summary
- 12 Tables are showing up there are a few that are not and need to be tested still.
- Report
- This page is working.
- Formatted Checkboxes with Headers.
- There is a dropdown box with only 1 format aka excel.
- The excel file is created and is in my downloads directory.
3/9/2023 Thursday
- Greenscope
- Basic Information page.
- Reference Conditions.
- These pages were skipped because they were a challenge at first.
3/10/2023 Friday
- Greenscope
- Finished up Compound details
- Change the economics/costs/ from int to .01 ProjectEconomicsCostFactorsView
- Change the utilities renewability from int to .01 ProjectUtilityRenewabilityView
- Updated the tasklist for Greenscope project along with a project estimation.